The story behind

Telit

SHARE:

The most significant project I did is the offices of Talit Company in Ramat Hachayal, Tel Aviv. The project covers a total area of 1,800 square meters.In the project, we carried out two floors within a building addition of ten floors.

The developers of the building built these floors.We were required to complete the project within two months in order to enable the developer to receive a building permit (Form no. 4 for electrical connection) on time. It is generally accepted that only after Form no. 4 for electrical connection finishing works are implemented in the floors. In addition, we were required to cast a smoothed concrete

floor with iron grids with thickness of about 8 cm as a final finish, and these after installing electrical infrastructures under the flooring and preparing it for pre-ordered floor – ceiling partitions. We combined special work of concrete and graphics and complex carpentry work that created a sense of advanced office and beautiful workspaces.

The stories behind the success